Setup and programming – Precision Digital PD662 User Manual
Page 13

PD662 Loop-Powered Meter
Instruction Manual
13
SETUP AND PROGRAMMING
• There
is
no need to recalibrate the meter for
milliamps when first received from the factory.
• The meter is factory calibrated for milliamps
prior to shipment. The calibration equipment
is certified to NIST standards.
Overview
There are no jumpers involved in the setup process of the meter.
Setup and programming is done through the front panel buttons.
After all connections have been completed and verified, apply power to
the loop.
For a Quick User Interface Reference Guide
go to page 31