Introduction – Logosol M8 User Manual
Page 2

These instructions are based on the
assumption that you have bought
the Hot Tub Kit (which includes a
stove, mounts and accessories)
from Logosol, art. no. 9999-000-
9999.
These instructions are very
exhaustive and describe all steps
in detail. Do not let the mass of text
scare you off. Building an outdoor
hot tub is quite easy; the first time
you do it, it will take about 15-25
hours, starting from unprocessed
boards. It will take considerable
less time if you build more than
one, since you then already have
everything set up. Read all the
instructions before starting the
work.
Accuracy
Most of the time, accuracy is not
all that important. One centimetre
more or less does not matter so
much. There are some exceptions,
though. Accuracy within +/- 1 mm
is required when you carve the
lines with the compass. Also, be as
careful as possible when you are
cutting with the jigsaw.
Accuracy within +/- 0.3 mm is
required when the side boards are
being cut into length, and when
you are cutting the recess where
the bottom will be fitted. (Take it
easy, it is not hard to saw correctly
when you know how to do it.)
Introduction
- Farmer's Sawmill Gas Chainsaw Electric Chainsaw Bandsaw Log Moulder TF230 E37 Friction Bandsaw Mill HD36 Bandsaw Mill LM29 Log Moulder LM410 E37 Friction for LM Pro C210 Big Mill TimberJig Big Mill Basic Big Mill Lsg Big Mill Pro Laks Frame Saw Sauno Wood Kiln Clivus Chain Grinder (Automatic) Chain Grinder (Big) Chain Grinder (Small) Guide Bar Grinder Band Grinder (Automatic) PH365 PH360 PH260 DH410 SH410 SH230 Dimensioning Saw PS315 Vertical Milling Machine MF30 H410 MH410 Knife Grinder (Tormek) PK1500 KS150