Phase 3 – preparation of counter-wall – MCZ Guttuso User Manual
Page 9
![background image](https://www.manualsdir.com/files/857123/content/doc009.png)
INSTALLATION AND USE MANUAL
Chapter 3
GUTTUSO
page
9
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.4. PHASE 3 – PREPARATION OF COUNTER-WALL
Before proceeding with the assembly of the Guttuso cladding, it is necessary to create two sides of the counter-
wall, complete with steel uprights that rest on the floor. The uprights must cover a distance of 10 cm with
respect to the front visible wall. This distance allows the hood support to be fastened to the upright).
N.B. Check the dimension of the fire bed before constructing the counter-wall, since the sides of the
counter-wall must perfectly fit the shape of the fire bed. If necessary, adjust the distance between
sides (if ≠ from 1390 mm) adapting the hole to the actual dimensions.
10
8
1390
33
3
830
ALTEZZA
MINIMA DEL
MONTANTE
MONTANTE
IN ACCIAIO
50
1390
=
=
VARIABILE
MONTANTI
IN ACCIAIO
MURO PERIMETRALE
M
URO PERI
MET
R
ALE
10
0