MCZ Guttuso User Manual
Page 14

INSTALLATION AND USE MANUAL
Chapter 3
GUTTUSO
page
14
Chapter 3
Technical service – all rights reserved by mcz spa
Reproduction prohibited
3.8. PHASE 7 – WORK TO BE DONE DURING INSTALLATION: HOOD AND PLINTH
After fastening the hood support, the hood can be made using fireproof material. It is strongly suggested to
insulate the hood of the Forma Puro95 fireplace stove.
In the Guttuso stainless steel version, it is necessary to cover the plinth of the fire bed, preferably using the
same material as the counter-wall. Upon completion, the cladding must appear with the fire bed hanging and
protruding from the wall.
In the Guttuso Piasentina stone version, the fire bed is already finished so that it may remain visible. However,
also for this model, it is possible to create a plinth during installation (as with the stainless steel version) so that
only the hanging top is visible.
GUTTUSO PIETRA PIASENTINA CON ZOCCOLO A VISTA
ZOCCOLO
GUTTUSO ACCIAIO INOX