4. INSTALLATION AND ASSEMBLY
IMPORTANT!
The stove must be installed and connected to the flue
pipe by a specialised technician or by competent
staff so that all local or national regulations are
complied with and in all cases in accordance with the
provisions of standard UNI 10683 REV.
When you unwrap the stove and related frame, make sure that
every part is in perfect working order or check for any damage
due to transport. If the stove is installed in a difficult to access place,
the weight can be lightened by removing the internal elements making
up the combustion chamber. We recommend you reposition each
element correctly.
4.1. PREPARATION AND UNPACKING
The Kasai stove is delivered with three different packagings:
one contains the stove (fig.2)
one contains the metal sides fig.3 pieces “6-7-8-9”
one contains the metal top fig.4 pieces “1-2-3-4-5”
Open the package and remove the two brackets that secure the stove
to the pallet (fig.1).
Remove the two screws (A) from the bracket at the bottom right and
left of the stove.
Then remove the other three screws (B) securing the bracket to the
pallet and position the stove in the chosen location, making sure it
complies with the applicable provisions.
A
A
B
B
B
STAFFA
Figure 2 - Kasai stove packaging
Figure 4 - Kasai stove ceramic packaging
Figure 1 - Removing the packaging
screws (Kasai stove)
Figure 3 - Kasai stove sides packaging
BRACKET