beautypg.com

Hydraulic connection, Ca2 a1 e – MCZ Duo HYDRO AIR User Manual

Page 34

background image

C

A2

A1

E

169

55 60 106

187

67

50

32

5-HYDRAULIC CONNECTION

PLUMBING SYSTEM CONNECTION

IMPORTANT!

The connection of the stove to the plumbing system must be carried out ONLY by specialized personnel who are

capable of carrying out installation properly, in compliance with current standards in the country of installation.

The manufacturer will not be held responsible for damage to persons or things in the event of failed operation if the

aforementioned warning is not complied with.

It is important that ONLY qualified engineers are used to fit and commission the appliance in ALL cases. The installing

engineer MUST hold a QCF recognised biomass qualification. Any company using sub-contractors MUST ensure they also

hold the relevant qualifications (ONLY FOR UK).

CONNECTION DIAGRAM

A1

Heating water supply 3/4”M

A2

Heating water return 3/4”M

C

3 bar safety shut off valve– 1/2”F

E

System emptying device 1/2”F

IMPORTANT!!!

CLEAN THE ENTIRE SYSTEM BEFORE CONNECTING THE STOVE, IN ORDER TO REMOVE ALL RESIDUE AND DEPOSITS.

Upstream from the stove, always install shutters so as to disconnect it from the plumbing system should it be

necessary to move it, or when it requires routine and/or special maintenance.

Connect the stove using hoses so that the stove is not too strictly connected to the system, and to allow slight

movements.

This manual is related to the following products: