MCZ Duo HYDRO AIR User Manual
Page 29

c
B
Z
V
U
A
A
27
4-INSTALLATION AND ASSEMBLY
Technical Dept. - All rights reserved - Reproduction is prohibited
On the left side (opposing the handle - fig.9) remove the micro-perforated grille "B" from the structure removing the two screws "c".
Insert the three ceramic pieces “U”, “V”, “Z” sliding them from the top towards the bottom on the guide of profile “A”.
ATTENTION!
On the top and lower part of the ceramic tile we recommend placing small pieces of felt in order to avoid that the
ceramic tiles break and also to level the spacing if necessary.
FIGURE 9 - SIDE PANEL ASSEMBLY
This manual is related to the following products: