beautypg.com

Installation and assembly – MCZ Duo HYDRO AIR User Manual

Page 22

background image

20

4-INSTALLATION AND ASSEMBLY

PREPARATION AND UNPACKING

The packaging consists of a recyclable cardboard box according to RESY standards, recyclable EPS foam inserts, wooden pallets. All

packaging materials can be reused for similar use or eventually disposed of as urban solid waste, in compliance with the regulations in

force.

After having removed the packaging make sure the product is intact.

Handle the product with suitable means paying attention to the applicable safety regulations in force. Do not turn the

packaging over and handle the ceramic parts with care.

The DUO stove is delivered with two overlapping packaging:

the first contains the stove structure (fig. 1).

the second (fig.2) contains the box with the ceramic cladding (1 top, 2 front panels, 6 side panels)

Open the packaging, remove the two screws on the right and the two screws on the left (see figure 4) that secure the base of the stove to

the pallet, and position the stove in the selected place, ensuring that it is complies with the above instructions.

FIGURE 1 - REMOVING PACKAGING

SCREWS

FIGURE 2 - CERAMIC PANEL

PACKAGING

This manual is related to the following products: