8 monitoring, 8 monitoring inverter operation – Yaskawa GPD505/P5 User Manual
Page 29
25
TM.IW.01
3-8 Monitoring Inverter Operation
The InverterWin
software may be used to monitor status of the inverter at any point
while it is online. Many of the inverter monitor parameters available from the inverter
keypad can be monitored from InverterWin
. The monitor function, when activated,
opens a new window on the left side of the screen that is always visible when the monitor
mode is active.
!
!
!
! Using the Monitor Feature
To use the monitor function, please follow this procedure:
1. Go online with the inverter.
2. Go to the menu and click on Operations > Start Monitor/Status to activate the
monitor function. A window with the monitored parameters will appear on the left
hand side of the screen (Figure 3.11). The monitor configuration icon
will
become active, indicating that the monitored parameters can be changed.
3. If you are using the monitor function for the first time or there are no monitor
parameters selected, the window that opens up on the left side will be blank (See
Figure 3.13).
4. Click on the enable button for each monitor parameter to start/stop the polling of
each monitor parameter. The button toggles in and out to turn off or on that monitor
parameter (Figure 3.12).
Figure 3.11: Monitor Started
Figure 3.12: Monitor Started Figure 3.13: Monitor Started
Monitors Enabled
Monitors Disabled
No Monitors Selected