beautypg.com

3 receiving, Contents and packaging, Tool requirements – Yaskawa PG-X2G5 User Manual

Page 11: 3receiving

background image

YASKAWA ELECTRIC TOBP C730600 23C 1000-Series Option SI-P3/V, SI-P3/T Installation Manual

11

3 Receiving

3

Receiving

Please perform the following tasks after receiving the PROFIBUS-DP Option:

• Inspect the PROFIBUS-DP Option for damage.

If the PROFIBUS-DP Option appears damaged upon receipt, contact the shipper

immediately.

• Verify receipt of the correct model by checking the information on the nameplate (see

Figure 2

).

• If you receive the wrong model or the PROFIBUS-DP Option does not function properly,

contact your supplier.

Contents and Packaging

Table 2 Contents of Package

Tool Requirements

Note: Tools required to prepare PROFIBUS cables for wiring are not listed in this manual.

Description:

Option Unit

Ground Cables

Warning Labels

Installation

Manual

(This book)

_

Quantity:

1

4

1

1

A Phillips screwdriver (M3, M3.5 to M6

<1>

) metric or (#1, #2

<1>

) U.S. standard size is required to install the

PROFIBUS-DP Option.

<1> Screw sizes vary by drive capacity. Select a screwdriver that matches the drive capacity.

MANUAL