beautypg.com

5 installation and uninstallation procedure, Installation method b – Yaskawa 1000 Series Drive Option User Manual

Page 20

background image

5 Installation and Uninstallation Procedure

20

YASKAWA ELECTRIC TOBP C730600 55D 1000-Series Option PS-A10 Installation Manual

Installation Method B

DANGER! Electrical Shock Hazard. Disconnect all power to the unit and wait at least the amount of time

specified on the unit front cover safety label. After all indicators are off, measure the DC bus voltage to

confirm safe level, and check for unsafe voltages before servicing. The internal capacitor remains charged

after the power supply is turned off.

NOTICE: Damage to Equipment. Observe proper electrostatic discharge procedures (ESD) when handling

the option, unit, and circuit boards. Failure to comply may result in ESD damage to circuitry.

1.

Shut off power to the unit, wait the appropriate amount of time for voltage to
dissipate, then use a Phillips screwdriver (M4) to remove the screw holding the

connector cover in place.

Figure 11

Figure 11 Remove the Connector Cover Screw

2.

Slide the connector cover as shown in

Figure 12

.

Figure 12

Figure 12 Slide the Connector Cover

Screw

Connector
cover

This manual is related to the following products: