beautypg.com

SMA String-Monitors Ethernet overvoltage protection set User Manual

Page 26

background image

☐ Cable type: at least Cat5 with shielding S-UTP, F-UTP or higher
☐ Maximum cable length: 100 m
☐ The RJ45 connectors must be connected in accordance with EIA/TIA 568B (eight-conductor):

Signal

Terminal
X7 and X9

EIA/TIA 568B (eight-con-
ductor)
Insulated conductor color

TX+

1
(white/orange)

White/orange

TX-

2
(orange/white or orange)

Orange/white or orange

RX+

3
(white/green)

White/green

Not assigned

4
(blue/white or blue)

Blue/white or blue

Not assigned

5
(white/blue)

White/blue

RX-

6
(green/white or green)

Green/white or green

Not assigned

7
(white/brown)

White/brown

Not assigned

8
(brown/white or brown)

Brown/white or brown

Procedure:

1. Disconnect the inverter on the DC side (see inverter manual).
2. Disconnect the SMA String-Monitor (see SMA String Monitor manual).
3. Disassemble the protective covers of the SMA String-Monitor (see SMA String-Monitor

manual).

4. At the bottom of the overvoltage protection unit,

attach the top-hat rail support with washer and
screw. The bracket of the top-hat rail support
must point to the side of the overvoltage
protection unit with the inscription EQUIP.

5. Install one overvoltage protection unit for each communication output and (where necessary)

communication input as follows:

4 Installation

SMA Solar Technology AG

Installation Manual

SSMAbleitKomm-IA-xx-10

26

ENGLISH