beautypg.com

Inside vertical installations - freestanding, Outside vertical installations - freestanding, Installation – Enviro EF4 User Manual

Page 20

background image

20

Installation

I

NSIDE

V

ERTICAL

I

NSTALLATIONS

- F

REESTANDING

:

1. Choose a stove location that is ideal. See the section “D

ECIDING

W

HERE

TO

L

OCATE

YOUR

P

ELLET

A

PPLIANCE

.”

Non-combustible

floor protection.

Existing floor

(combustible)

6"

(15 cm)

3" (7.5 cm)

clearance

Use wall thimble

or ceiling firestop

Rain cap

Flashing

24"

(61 cm)

3"

(7.5 cm)

Tee with

cleanout

Fresh air

intake

6"

(15 cm)

Figure 23: Inside Vertical Installation.

2. Place a non-combustible hearth

pad where necessary.

3. Place the unit on the hearth pad

(if installed on a carpeted surface)

and space the unit in a manner so

when the pellet vent is installed

vertically, it will be 3” (7.6 cm)

away from a combustible wall.

4. Locate the center of the fresh air

intake pipe on the unit. Match that

center with the same point on the

wall and cut a hole about 1 5⁄8” (41

mm) in diameter.

5. Install the fresh air intake pipe.
6. Install the tee with clean out.
7.

I

nstall the pellet vent upward

from there. When you reach the

ceiling, make sure that the vent

goes through the ceiling fire stop.

Maintain a 3” (7.6 cm) distance

to combustibles and keep attic

insulation away from the vent

pipe. Maintain an effective vapor

barrier.

8. Finally, extend the pellet vent to

go through the roof flashing.

9. Ensure that the rain cap is

approximately 36” (915 mm)

above the roof.

O

UTSIDE

V

ERTICAL

I

NSTALLATIONS

- F

REESTANDING

:

To accomplish a outside vertical pipe installation, follow steps 1 through 5 in the “I

NSIDE

V

ERTICAL

I

NSTALLATIONS

- F

REESTANDING

” section and then finish it by performing the following (refer to Figure 24).

1. Install a tee with clean out on the outside of the house.
2. Install PL vent upward from the tee. Make sure that you install support brackets to keep the vent

straight and secure.

3. Install ceiling thimble and secure the flashing as you go through the roof.
4. Ensure that the rain cap is approximately 36” (91.5 cm) above the roof.