beautypg.com

SMA ESHV-P-NR User Manual

Page 18

background image

Installation

SMA Solar Technology AG

18

ESHV-IXX103013

Installation Guide

6. Clean the surface to which the grounding set will be affixed with a degreasing, non-corrosive

cleaning agent. Take care to ensure that no moisture reaches the inverter's electronics.

7. Attach the two adhesive mounting bases about 2 cm apart from each other and press firmly for

5 seconds.

8. Feed the cable ties through the slots in the mounting base.
9. Fasten the grounding set with the aid of cable ties, then shorten the cable ties.

10. Feed the connection cables of the grounding set to the varistor terminal block.
11. Use the extractor tool to fasten the connection cables in the round varistor terminals with the

corresponding colored labeling (red cable to the terminal marked red, etc.).

12. Push the cable end sleeves all the way into the terminals.
13. Check the connection for reverse polarity protection:

Visual Inspection:
– Is the label properly positioned?
– Does it correspond to the right inverter type?
– Do the connection cable colors correspond to the terminal colors?

20 m

m

Position of the adhesive mounting base

Cable ties

20 mm

This manual is related to the following products: