9.4 Replacing an Inverter
Requirements:
☐ The new inverter must be a micro inverter.
☐ The new inverter must be commissioned in your plant.
☐ The new inverter must be connected to the Sunny Multigate (see installation manual for the
Sunny Multigate).
☐ You must have the user role Installer or Plant administrator (see Section 10.1).
Procedure:
1. Select Plant Selection > "My micro inverter plant" in the page and drop-down menu if you
have several Sunny Portal plants.
2. Select Configuration > Device Overview in the page and drop-down menu.
3. Select the Overview of New Devices tab.
4. Select [Refresh devices]. Your plant is then searched for new devices.
☑ After around one minute, the new inverter is displayed.
5. In the row for the inverter to be replaced, select
.
☑ Sunny Portal establishes a connection to the new inverter via the Sunny Multigate.
Page 2 of the Configuration Assistant opens.
6. Follow the Configuration Assistant instructions.
Device replacement: Do not delete old device
If you delete the device that you wish to replace from Sunny Portal, all the device data is
irretrievably deleted.
• To retain the data of the old device in Sunny Portal, do not delete the device.