ShoreLand'r SRV59TBBA User Manual
Page 10

Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003248
Page 10
Rev C 04/10/2009
Springs/axles:
Mount springs on axle by aligning the stub bolt on
the leaf springs with the hole in the center of the
spring pad on the axle, place a spring clamp on top
of the leaf spring. Slide two (2) ½” x 2-5/16” x 6-½”
square u-bolts over the springs and spring clamp,
slide a spring/axle u-bolt pad over the threaded
ends of the u-bolts and secure with ½” flange lock
nuts. Repeat on other side of axle and on other
axle.
Place axle with the brakes to the rear of the trailer,
slide a spring bushing into the rear loop on the
spring bracket and insert a 9/16” x 3-¼” hex bolt
from the outside in and secure with a 9/16” lock nut.
Repeat on other side of trailer. Slide the hook end
of the spring over the bushing and swing the axle
up so the hole in the front of the leaf spring aligns
with the rear hole in the rocker, insert 9/16” x 3-¼”
hex bolt and secure with 9/16” lock nut. Repeat
on other side. To mount the front non brake axle,
insert a spring bushing into the front of the rocker
and align with the hole, insert a 9/16” x 3-¼” hex
bolt and secure with a 9/16” lock nut. Repeat on
the other side. Swing axle into place so the front
of the leaf spring aligns with the hole in the front
loop on the spring bracket and insert a 9/16” x 3-
¼” hex bolt from the outside in and secure with a
9/16” lock nut. Repeat on other side.
Remove plug from right side caliper and insert
brake hose assembly securely, place the other
end of the hose into the clip on the spring bracket
and secure with the hose clip. Carefully uncoil the
brake line and insert into the hose.
Tire And Wheel Assemblies
Mount the tire and wheel assemblies using the 1/2”
fine threaded tapered lug nuts provided. Tighten
to 80-90 ft/lb. of torque using the rotation pattern
as shown in the ShoreLandr’s Owners Manual.
Re-torque the lug nuts after 50 miles of driving and
then periodically thereafter.
Brakes:
Refer to the Brake Service Manual for brake bleed-
ing procedure, service and maintenance.
Consumer / Owner:
Your SeaRay trailer is designed, assembled and
pre-adjusted to fit your boat. If properly maintained
it will give your boat maximum support and many
years of care free service.
Follow these instructions before using your trailer:
Read your ShoreLand’r Owner’s Guide and all
safety decals on the trailer.
Wash and wax your trailer regularly. Always rinse
your trailer after each use, especially when boat-
ing in salt or brackish water.
The law requires that the white ground wire on
both the trailer wire harness and the vehicle har-
ness be properly grounded.
Re-check all fasteners for tighteness before tow-
ing.
Contact your authorized ShoreLand’r dealer if
you experience a problem with your trailer. To lo-
cate a dealer, please use
www.shorelandr.com
- dealer locator feature.
For further information or assistance, contact
ShoreLand’r at 1-800-859-3028 or visit www.
shorelandr.com.