3ATV / 3ATVA Assembly Instructions:

Cut all banding and sort hardware bags.

L a y t h e 3 AT V o r 3 AT VA o n t h e s a w h o r s e s

(recommendation) to assemble.

Run tongue wire harness through the tongue and plug into

the side frame harnesses on the frame.

Slide the tongue into the two (2) tongue channel on the frame

and secure with two (2) 1/2” X 4-1/2” hex bolts and two (2)

1/2” flange lock nuts.

Plug the tongue wire harness into the side frame harnesses

on the frame. The white ground wire must be attached to the

frame by placing a self-tapping screw into the round ring on

the white ground wire of the tongue harness, then drilling into

the trailer frame tube member.

See Detail B.

Insert a 3/8” X 1-1/4” hex bolt with a 3/8” flat washer and

safety chain through the lower hole on the front of the tongue.

Secure with a 3/8” flat washer and 3/8” flange lock nut.

Repeat assembly on opposite side of the tongue.

Mount the coupler to the tongue using two (2) 1/2” X 1” hex

bolts in the front holes and one (1) 1/2” X 4” hex bolt in the

rear hole of the coupler. Secure the 1/2” flange lock nuts.

AXLE ASSEMBLY:

Remove the spring channels from the axle. Attach the spring

channels to the side frame using 1/2” X 3” hex bolts and

secure with 1/2” flange lock nuts.

Place the other 1/2” X 3” hex bolt into the spring channel and

through the frame. Secure with 1/2” flange lock nuts.

NOTE:

10” Tire - Top hole on spring channel

13” Tire - Bottom hole on spring channel

In the rear spring channel place the spring bracket bushing

(Ref.#6) into specific hole location, refer to the

NOTE for

placement depending on tire size. Secure the spring bracket

bushing to the spring channel using a 9/16” X 3-1/4” hex bolt

and 9/16” hex bolt.

Slide the hook end of the spring over the spring bracket

bushing just installed.

Mount the other end of the spring to the spring channel using

a 9/16” X 3-1/4” hex bolt and secure with a 9/16” hex nut. Do

not over tighten.

Mount the axle assembly to the leaf spring using two (2) 1/2”

X 2-5/16” X 5-3/4” u-bolts, one (1) spring clamp and one (1)

spring plate. Secure with 1/2” flange lock nuts. Refer to the

Detail A for placement. Repeat on opposite side of the axle

assembly.

Raise the axle assembly up under the leaf springs and align

the pin on the bottom side of the spring with the hole in the

axle. Align the holes in a spring plate with the legs of the U-

bolts just placed around the springs. Slide the spring plate

onto the U-bolts and secure with 1/2” flange lock nuts. Repeat

on the second spring on the opposite side of the trailer.

Remove the stud thread protectors. Mount the tires to the

hubs using 1/2” lug nuts. Note the taper end of the nut must

be towards the rim. Hand tighten the lug nuts using the star

pattern as described in the owners guide. Use a torque wrench

for the final tightening of the lug nuts. Torque to 85-95 ft. lbs.

of torque. Recheck the torque after 50 miles of use, then

periodically thereafter.

Installing the Ramps and the

Retainer Attachment Channels

Installing the ramps in the following manner will allow for the

removal of the ramp from the drivers side of the trailer first.

Locate the four ramp retainer attachment channels. Note

that they are all identical.The two ramp retainer attachment

channels on the right side of the trailer will be installed on the

front side of the trailer front frame tube to support the ramp

as shown in Detail D.

Install the other two ramp retainer attachment channels on

the left side of the trailer to the rear of the front frame tube as

shown in Detail E. This will allow the ramps to overlap past

each other in the middle.

Place a 3/8” x 3 7/8” x 3” square U-bolt around the front frame

tube so the legs of the U-bolt are pointing forward. Align the

holes in one of the ramp retainer attachment channels with

the U-bolt legs, then slide into position. Note that this chan-

nel is mounted on the front side of the frame tube. Secure in

place with 3/8” hex flange lock nuts. Position the U-bolt so it

is 10 ½” from the outside of the side frame tube as shown on

page 3. Tighten in position. Repeat this process on a second

channel. Position this ramp retainer attachment channel so

that the center hole in the bracket is 27” from the center hole

in the ramp retainer attachment channel just installed. Tighten

enough only to hold in position until the ramp is installed.

Place a 3/8” x 3 7/8” x 3” square U-bolt around the front frame

tube so the legs of the U-bolt are pointing backward. See De-

tail E. Align the holes in one of the ramp retainer attachment

channels with the U-bolt legs, then slide into position. Note

that this channel is on the rear side of the frame tube as shown

in Detail E. Secure in place with 3/8” hex flange lock nuts.

Position the U-bolt so it is 10 ½” from the outside of the side

frame tube as described above for the opposite side of the

trailer. Tighten in position. Repeat this process on a second

channel. Position this ramp retainer attachment channel so

that the center hole in the bracket is 27” from the center hole

in the ramp retainer attachment channel just installed. Tighten

enough only to hold in position until the ramp is installed.

Once all four of the ramp retainer attachment channels are

attached to the frame, position the right ramp in the ramp

retainer attachment channels. The ramp can either be slid