beautypg.com

ShoreLand'r PWC1000L V.1 User Manual

Page 3

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0002990

Page 3

REV A 01/09/06

Remove the small parts from the frame by cutting the banding. Re-

move the bolt bag and sort all the nuts and bolts by size.

Tongue:

Take the tongue and slide into the tongue channel. Secure with

a 3/8” X 4” carriage bolt in the front and 3/8” X 3-7/16” X 4-1/8”

square u-bolt, 1” X 4-1/2” mounting strap and 3/8” flange lock nut in

the rear of the assembly. Thread the tongue wire harness through

the tongue and connect to the frame harness. Install grommets.

NOTE: Install the tongue in one of the two adjustment holes in the

tongue channel. Refer to the parts drawing for placement.

Safety Chain:

Insert a 3/8” X 1-1/4” hex bolt with a 3/8” flat washer and safety

chain through the lower hole on the front of the tongue. Secure with

a 3/8” flange lock nut. Repeat this procedure on the opposite side

of the tongue.

Coupler:

Mount the coupler onto the tongue with one (1) 1/2” X 4” hex bolt

and two (2) 1/2” X 1” hex bolts. Secure with 1/2” flange lock nuts.

Winch Post:

Attach the winch brace to the winch post assembly with a 3/8” X 4”

hex bolt in one (1) of the three (3) holes of adjustment. Position the

winch assembly on the tongue in the desired position and fasten

with a 3/8” X 3-7/16” X 4-1/8” square u-bolts, 1” X 4-1/2” mounting

straps and 3/8” flange lock nuts.

Axle:

Install the spring bushing in the rear spring brackets with 1/2” X 3-

1/4” hex bolts and 1/2” flange lock nuts. Position the axle under the

trailer with the spring eye to the front. Slip the flat end of the spring

in the rear spring bracket over the bushing and fasten the front

spring eye to the front of the spring bracket with 9/16” X 3-1/4” hex

bolts and 9/16” hex lock nuts.

Mount the tire and rim assemblies with 1/2” lug nuts and tighten to

80-90 ft./lbs. of torque.

Bunk:

Slide a 3/8” X 2-7/16” X 2-3/4” square bolt over the rear cross mem-

ber with the threads facing the

REAR. Place an adjustable bunk

bracket on the u-bolt legs and secure with 3/8” flange lock nuts.

Slide on a 3/8” X 2-7/16” X 2-3/4” square u-bolt over the front cross

member with the threads facing the

FRONT. Place an adjustable

bunk bracket on the u-bolt legs and secure with 3/8” flange lock

nuts. Fasten the bunk assembly to the adjustable bunk brackets

just mounted and secure with 3/8” X 1” hex bolts and 3/8” flange

lock nuts.

CAUTION:

To prevent damage to your water vehicle hull, place the water ve-

hicle on the trailer, loosen bunk u-bolts so the bunks conform to the

hull. Tighten.

Tighten all fasteners before towing.

The law requires that the white wire on both the tongue and vehicle

wire harness be grounded to the trailer and towing vehicle.