beautypg.com

ShoreLand'r SLR46TBS V.2 User Manual

Page 3

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003471

Page 3

R SERIES

The R-series roller rack is installed by placing the roller arm

assembly mounting channel over the rear cross member and

securing in place with a 1/2” x 4-1/2” hex bolt and lock nut.

(See Diagram A). Note that it should be left loose until the

boat is placed on the trailer. Once the proper positions is de-

termined, it may be tightened. Repeat on the other roller arm

assembly.

The short stabilizer bunk is installed to the adjustable bunk

bracket on the front cross member with a 3/8” x 1” hex bolt

and lock nut. (See Diagram A, Detail C).