beautypg.com

ShoreLand'r SLB46TBAL User Manual

Page 11

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

(800)859-3028

www.shorelandr.com

M303105

Page 11

RB SERIES
Locate the two 2 x 6 bunk assemblies. The bunk mount-
ing brackets on the bunk assemblies are mounted at
the factory. Place a bunk support pivot on one end of
the bunk support tube and align the holes. Repeat on
the other end. Lower the assembly on the bunk
support pivots just installed so the U-bolts align and go
through the holes in the bunk support pivots. Secure
by placing first a spacer bushing on the U-bolt leg and
then a 1/2” hex lock nut. Tighten. Repeat on the other
end of the arm. (See Detail S)

The short stabilizer bunk is installed to the adjustable
bunk bracket on the front cross member with a 3/8” x 1”
hex bolt and lock nut. (See Detail R and Page 10.)