beautypg.com

ShoreLand'r SL23AL User Manual

Page 6

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

(800)859-3028

www.shorelandr.com

M303185

Page 6

RB Series
Place the RB arm assembly mounting
channel over the rear cross member and
secure with a 1/2” x 4-1/4” hex bolt and
lock nut. (See Detail I). Repeat on the
other RB arm assembly. The RB
assemby should be left loose until the
boat is placed on the trailer for
adjustment. Once the position is
determined, tightened.

The short stabilizer bunk is mounted to
the adjustable bunk bracket on the front
cross member with a 3/8” x 1” hex bolt
and lock nut. (See Detail O, Page 10).

See Page 16 for final adjustments.