beautypg.com

ShoreLand'r SL46TBAL User Manual

Page 11

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003629

Page 11

3/09/06

RB SERIES

Locate the two 2 x 6 bunk assemblies. The bunk mount-

ing brackets on the bunk assemblies are mounted at

the factory. Place a bunk support pivot on one end of

the bunk support tube and align the holes. Repeat

on the other end. Lower the assembly on the bunk

support pivots just installed so the U-bolts align and

go through the holes in the bunk support pivots.

Secure by placing first a spacer bushing on the U-

bolt leg and then a 1/2” hex lock nut. Tighten. Re-

peat on the other end of the arm. (See Detail S)

The short stabilizer bunk is installed to the adjustable bunk

bracket on the front cross member with a 3/8” x 1” hex bolt

and lock nut. (See Detail R and Page 10.)