beautypg.com

ShoreLand'r SL23AL User Manual

Page 6

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003626

Page 6

3/07/06

RB Series

Place the RB arm assembly mounting channel over

the rear cross member and secure with a 1/2” x 4-1/4”

hex bolt and lock nut. (See Detail I). Repeat on the

other RB arm assembly. The RB assemby should be

left loose until the boat is placed on the trailer for adjust-

ment. Once the position is determined, tightened.

The short stabilizer bunk is mounted to the adjustable bunk

bracket on the front cross member with a 3/8” x 1” hex bolt

and lock nut. (See Detail O, Page 10).

See Page 16 for final adjustments.