The Terminator ZT / FAK-4L Thermostat In-Line Power
Kit is designed to provide accurate control with the ZT
thermostat and make a waterproof seal over the end of
TubeTrace and terminate Thermon electric heat trace in
an approved Terminator junction box. Review Instructions
prior to installation. Kit will make one connection.

2

Installation Precautions . . .
• Keep ends of bundles, heat tracing and kit components

dry before and during installation.

• To minimize the potential for arcing on electrical

heat tracing caused by product damage or improper
installation, use appropriate ground-fault circuit
protection.

• Installation must comply with Thermon requirements

and be installed in accordance with any applicable
national and local codes.

• Component approvals and performance ratings are

based on the use of Thermon specifi ed parts only. User
supplied power connection fi ttings must be listed or
certifi ed for intended use.

• De-energize all power sources before opening

enclosure.

• Individuals installing these products are responsible

for complying with all applicable safety and health
guidelines. Proper personal protective equipment, or
PPE, should be utilized during installation. Contact
Thermon if you have any additional questions.

Terminator ZT Certifi cations/Approvals . . .

INSTALLATION PROCEDURES

1725 II 2 GD Ex db eb IIC T5-T6, Ex tb IIIC T100°C-T85°C FM10ATEX0058X

IP66 -60°C  Ta  +50°C T5, 100°C; -60°C Ta +40°C T6, 85°C
Ordinary & Hazardous Locations

FMG 10.0022X Ex db eb IIC T5-T6, Ex tb IIIC T100°C-T85°C

2.

Trim tubing to within 85mm (3-1/4”) of the
end of the insulation. If self regulating heat
trace proceed to step 3. For Zone-type heat trace
continue with identifi cation of bus connection on
step 2a.

1.

Remove outer jacket and insulation from tubing
bundle approximately 508mm (20”) from end of
the tubing bundle.

508mm

(20”)

Tubing Bundle

85mm

(3-1/4”)

2a.

Strip back bundle insulation 85mm (3 1/4”)
beyond bus connection indentation of each heat
tracing. If bus connection indentation is less than
305mm (12”)-381mm (15”) from end of the heat
tracing, proceed stripping the bundle insulation
to the next indentation. Trim tubes so the bus
connection indentation on each meet.

Tubing

3.

Make tube fi tting connections with appropriate
fi tting (provided by others). Test fi tting for leaks
before proceeding. Mount tube fi tting shifted
from each other in case of multiple tubes.

508mm

(20”)

Tubing

Heat Tracing

Self-Regulating Heat Tracing

Zone Type Heat Tracing

85mm

(3-1/4”)

Tubing

Heat Tracing

305mm -381mm

(12” - 15”)

Bus Connection

Indentations

(Zone Heater Only)

Tube Fitting

(Provided by Others)

Heat Tracing

Heat Tracing

CAUTION

(Found on TubeTrace SE/ME bundles)

Do not cut or damage the heat
trace or sampling tube.

5.

Cut splice cover ends to match outside diameter
of tubing bundle. For bundle diameter less than
48mm remove only the closed in part.

Splice Cover

Top

Tubing

Bundle

Cut and Remove

End Pieces to fi t

Heat Tracing

Splice Cover

Base

4.

Cut the ends of the cable at an angle to aid in
piercing grommet.

45°

Heat Tracing