Terminator, Ecm-r-xp, Installation procedures – Thermon ECM-R-XP User Manual
Page 4
Terminator
TM
ECM-R-XP
INSTALLATION PROCEDURES
13.
Install power cable.
15.
Use the rotary switches for settling
Control and Limit Temperature,
(Celcius or Fahrenheit) and Auto or
Manual reset (Control switches on
Type "C", Limiter switches on Type
"L" and both on Type "CL").
14.
Install electronic control module and
complete system wiring. Terminal set
screws shall be tightened to a torque
value of 1,4 Nm (12,4 lb-in). See
wiring details. Set modules electronic
control and/or control limiter at desired
setpoints.
12.
Remove M25 dust cap. Install M25
power gland (order separately) and
M25 blind plug.
11.
Mount junction box base on expediter.
Make sure to align slots to properly
orient junction box base. Tighten nut
with Terminator-LN-Tool. If mounting
horizontally, threaded gland holes must
face downward.
10.
Fix expediter, RTD, and lead wire to pipe.
16.
Install junction box lid and twist hand
tight. Insert screwdriver into ratchet slots
located on side of junction box base.
17.
Use screwdriver to ratchet on junction
box lid. Lid will rotate 30 degrees.
18.
Lid latch mechanism fully engaged. To
remove lid, repeat steps 16 and 17 but
in the opposite direction.