beautypg.com

Terminator, Ecm-r-xp, Installation procedures – Thermon ECM-R-XP User Manual

Page 3

background image

3

Terminator

TM

ECM-R-XP

INSTALLATION PROCEDURES

1.

Cut end of cable at angle to aid in piercing

grommet. Leave additional cable for

expansion loop.

5.

Insert banding guide into expediter and

snap into place.

3.

Insert cable into expediter. If mounted on

bottom or side of pipe, punch out weep hole.

4.

Slide expediter toward pipe and route

cable through support base entry.

6.

Mount expediter to pipe using pipe band.

Do not band over cable.

7.

Cut off end of cable.

2.

Position RTD Sensor(s) in grommet (when

applicable). Do not pull from the sensor

end when routing through the expediter

assembly. Pull sensor from the lead wire

portion.

8.

Terminate cable with appropriate PETK

termination kit. Refer to PETK installation

instructions.

9.

Push excess cable and RTD cable back

through expediter. Tighten cap securely.

Tape cable expansion loop to pipe.