Terminator, Ecm-r-xp, Installation procedures – Thermon ECM-R-XP User Manual
Page 2
2
Tools Required . . .
Kit Contents . . .
1
2
6
4
3
8
5
7
9
Item Quantity
Description
1
1
Expediter Assembly
Support Cap with O-Ring
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Junction Box Lid
3
1
Junction Box Base with O-Ring & M25
Dust Cap
4
1
Nut
5
1
Banding
6
1
Banding Guide
7
1
Electronic Control Module w/ Terminal Blocks
(Refer to terminal specifications for maximum allowable wire size)
ECM Type*
C - Controler
L - Limiter
CL - Controller/Limiter
* The maximum pipe exposure temperature is limited to 250°C
8
1
Junction Box Lid Cord
9
3
Blind Plug
Terminator-LN-Tool
(order separately)
3 mm
8 mm
28 mm
Warnings . . .
• Due to the risk of electrical shock, arcing and fire
caused by product damage or improper usage,
installation or maintenance, a ground-fault protection
device is required.
• Installation must comply with Thermon requirements
(including form PN 50207U for Ex systems) and be
installed in accordance with the regulations as per the
norm EN IEC 60079-14 for hazardous areas (where
applicable), or any other applicable national and local
codes.
• Component approvals and performance ratings are
based on the use of Thermon specified parts only.
• De-energize all power sources before opening
enclosure.
• Avoid electrostatic charge. Clean only with a damp
cloth.
• Keep ends of heating cable and kit components dry
before and during installation.
• Minimum bending radius of heating cable is five (5)
times the cable outer diameter.
• Individuals installing these products are responsible
for complying with all applicable safety and health
guidelines. Proper Personal Protective Equipment
(PPE) should be utilized during installation. Contact
Thermon if you have any additional questions.
The following installation procedures are suggested
guidelines for the installation of the Terminator ECM-R-XP
Kit. For translations other than English and local language
translation provided here, please contact Thermon. The
English language installation procedure shall govern.
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the
proper type and quantity has been received.
4. Store in a dry location.
Dimensions . . .
Terminator
TM
ECM-R-XP
INSTALLATION PROCEDURES
1725
II 2 GD Ex eb mb [ib]ib I
IC T4, Ex tb I
IIC T135°C
S
IRA 12ATE
X5239X
IP66
-60°C ≤ Ta
≤ + 55°
C
IECEx SIR 12.0103X
Ex eb mb [ib]ib I
IC T4, Ex tb I
IIC T135°C
PN 27673
Do n
ot op
en while energized. See ins
talla
tio
n i
ns
tru
ct
io
ns
.
Te
rm
inator ECM
Fo
r u
se
as
an
ad
just
able e
lectronic contro
l mo
dule
Crimp Tool 2,5mm
2
Order Separately . . .
PETK Power and End Termination Kits (per cable)
PETK-5
for direct connection
PETK-10
for cold lead connection (TESH 2.9-15)
PETK-11
for cold lead connection (TESH 17.8-8000)
Certifications/Approvals . . .
Ordinary & Hazardous Locations
International Electrotechnical Commission
IEC Certification Scheme for Explosive Atmospheres
SIR 12.0103X
II 2 (2) G Ex eb mb [ib] IIC T4, Ex tb IIIC T135°C SIRA 12ATEX5239X
II 2 (2) D Ex tb IIIC T135°C IP66 Db