Terminator, Zt-p-xp, Installation procedures – Thermon ZT-P-XP User Manual
Page 5: Two cable layout tips, Wiring details

Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to
aid in piercing grommet. Leave additional cable
for expansion loop.
Two Cable Layout Tips
Insert two cables into expediter.
Note: For HPT and FP cable, exchange
grommet in Terminator with grommet provided
in PETK-3-ZT.
Wiring Details
Power Supply
L1
N
PE
Heat Trace #1
Thermostat Connection (1 or 2 Heating Cables)
Heat Trace #2
2
2
4 L1
N
N
PE
PE
Terminator
TM
ZT-P-XP
INSTALLATION PROCEDURES
Thermostat Connection (1 Heating Cable Shown)
400 Vac Option.
Power Supply
L1
N
Heat Trace
2
L1 N
4
PE
PE
See also other documents in the category Thermon Hardware:
- WMK Terminator (4 pages)
- Electric Heat Tracing (12 pages)
- SCTK (5 pages)
- PETK (7 pages)
- ZE-B Beacon Terminator (4 pages)
- ZP-WP Terminator (4 pages)
- ZP-S-WP Terminator (8 pages)
- ZP-XP Terminator (6 pages)
- ZE Terminator (4 pages)
- PETK-3 (5 pages)
- ZL Terminator (7 pages)
- PETK-4 (6 pages)
- HT Heating Module (4 pages)
- MIQ Mineral Insulated Heating Cable v.1 (11 pages)
- MIQ Mineral Insulated Heating Cable v.2 (14 pages)
- ZP-MI-WP Terminator (7 pages)
- ECM-MI-WP Terminator (4 pages)
- ZT-MI-WP Terminator (4 pages)
- ZP-PTD100-XP Terminator (8 pages)
- ZP-PTD100-WP Terminator (7 pages)
- ZT-P-WP (8 pages)
- PETK-11 (9 pages)
- ECM-R-XP (8 pages)
- ZP-R-WP (4 pages)
- MI (26 pages)
- ZP-R-XP (4 pages)
- ECM-P-XP (8 pages)
- ECM-R-WP (8 pages)
- ECM-Ambient-WP (4 pages)
- ECM-OS (4 pages)
- SafeTrace Steam Tracers (8 pages)
- TraceNet TCM 18 (96 pages)
- Heat Transfer Compounds (8 pages)
- HeetSheet (4 pages)
- ThermoTube Type SL (4 pages)
- Tubing Bundle v.2 (8 pages)
- ET-6C (2 pages)
- FAK-4L Kit (5 pages)
- TBX-3LC (5 pages)
- ET-7C (4 pages)
- FAK10A-B-C (4 pages)
- FAK-7 (2 pages)
- FAK-9 (4 pages)
- FAK-1 (4 pages)