beautypg.com

Terminator, Zt-p-xp, Installation procedures – Thermon ZT-P-XP User Manual

Page 3

background image

3

1.

Locate bus connection (HPT and FP only)
and cable as shown. Cut end of cable at
angle to aid in piercing grommet. Leave
additional cable for expansion loop. See
page 5 for multiple cable installation tips.

5.

Insert banding guide into expediter and
snap into place.

3.

Insert cable into expediter. If mounted on
bottom or side of pipe, punch out weep
hole.

4.

Slide expediter toward pipe and route
cable through support base entry.

8.

Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instructions. Push excess cable back
through expediter. Tighten cap securely.
Tape cable expansion loop to pipe.

6.

Mount expediter to pipe using pipe band.
Do not band over cable.

7.

Cut off end of cable.

9.

Remove expediter from pipe by removing
pipe band.

2.

For HPT and FP cable, exchange grommet
in Terminator with grommet provided in
PETK-3-ZT.

GRW

GRW-G/Tstat

Terminator

TM

ZT-P-XP

INSTALLATION PROCEDURES