beautypg.com

Petk, Installation procedures, Step 4: end termination for hpt and fp 4a – Thermon PETK User Manual

Page 5

background image

5

4a.

Cut and remove heating cable overjacket.

4b.

Trim away exposed braid from cable.

4c.

Fill the end cap with RTV sealant and

apply a circumferential bead to cable

[minimum of 3 mm (0.12”) wide]. Slide

end cap onto end of cable.

Step 4:

End Termination for HPT and FP

4a.

Trim the cable 75mm (3”) from the bus

connection.

4b.

Cut and remove overjacket and trim away

exposed braid from cable.

4c.

Cut and remove primary insulation jacket.

4d.

Cut and remove fiberglass overlay and

heating element. Push any remaining

heating element wire under the primary

insulation jacket.

4e.

Cut and remove pairing jacket. Stagger

cut one of the bus wires.

4f.

Tape bus wires individually and then

together. Continue taping to cover over-

jacket. Fill the end cap with RTV sealant

and apply a circumferential bead to cable

[minimum of 3 mm (0.12”) wide]. Slide end

cap onto end of cable.

Do not cut bus wire strands.

13 mm

(.5”)

75 mm

(3”)

Bus

Connection

25 mm

(1”)

19 mm

(.75”)

6 mm

(.25”)

PETK

INSTALLATION PROCEDURES

Step 4:

End Termination for BSX, RSX, HTSX, KSX, and VSX Cables