Petk, Installation procedures – Thermon PETK User Manual
Page 3
![background image](https://www.manualsdir.com/files/807589/content/doc003.png)
3
Step 2:
Matrix Removal for BSX, RSX, HTSX, KSX, and VSX Cables
2b.
Cut a 4mm strip of conductive matrix
between the conductors.
Do not cut bus wire strands.
2c.
Cut and remove the 4mm matrix strip.
2a.
Cut and remove primary insulation jacket
(BSX and RSX cables only).
Step 1:
Remove Heating Cable Overjacket and Separate Metallic Braid to Form Pigtail
1b.
Separate braid strands at edge of over-
jacket and pull cable through opening in
braid.
1c.
Twist braid into a pigtail. Trim ends of
braid.
1a.
Cut and remove heating cable overjacket.
Do
not cut metallic braid.
For HPT and FP cable exchange grommet
supplied in Terminator kit with:
GRW-G provided in PETK-3
GRW-GT2 provided in PETK-3-ECM
GRW-G/Tstat provided in PETK-3-ZT
IMPORTANT!
Heating cable must be
properly installed within
expediter assembly and
mounted to pipe prior to
terminating with PETK kit.
See Terminator Installation
Instructions for expediter
mounting details.
152 mm
(6”)
PETK
INSTALLATION PROCEDURES
4 mm
(.15”)
4 mm
(.15”)
Terminator: Route cable through base entry
and mount expediter to pipe using pipe band.
Do not band over cable.
GRW
GRW-G
GRW-GT2
GRW-G/Tstat