Plumbing connections – Super Systems HP15 User Manual
Page 7

HP 15 Manual Rev A
Page 7 of 7
Plumbing Connections
The sample gas can be transported from the sample port on the furnace to the bottom of the
external filter on the side of the electrical enclosure using silicone tubing. The sample flow
should be between 4.0 and 5.0 SCFH. Silicone tubing should also connect the ports on the side
of the electrical enclosure to the probe in the heater enclosure. Connect tubing from the fitting
on the electrical enclosure marked “To Probe Reference” to the “Ref. Air” port on the probe. A
connection should also be made between the “To Burnoff Port” fitting and the “B.O.” fitting on
the probe. There is a barb fitting on the stainless steel well on the heated probe. This is the
vent, which needs to be routed to an appropriately safe location.
- Bazooka Probe (10 pages)
- Gold Probe (16 pages)
- HP2000 With 9100 Controller (10 pages)
- SuperOX (14 pages)
- PGA3000 (16 pages)
- PGA3500 (26 pages)
- e-TRIM (27 pages)
- 9120 with TS (80 pages)
- MGA6000 (42 pages)
- DP2000 (17 pages)
- DPC3500 (5 pages)
- MGA6010 (54 pages)
- DPC2530 (17 pages)
- Simple Dew (18 pages)
- DPL4000 (16 pages)
- H2 Sensor (17 pages)
- Hydrogen Nitrider Analyzer (12 pages)
- PH2 (19 pages)
- AC20 Quick Start (5 pages)
- XGA Viewer (46 pages)
- AC20 RS485 Modbus (62 pages)
- AC20 (114 pages)
- 20Q Calibration Manual (9 pages)
- CAT-100 (51 pages)
- 7EK 31080 (32 pages)
- 7EK 31082 Calibration Manual (5 pages)
- 7EK 31081 (36 pages)
- 7EK 31082 (34 pages)
- 20PQ (170 pages)
- X5 Calibration Manual (1 page)
- 20Q (126 pages)
- 7SL (36 pages)
- X5 (74 pages)
- 9000 Series (15 pages)
- 3L Series (54 pages)
- 9015 Series (11 pages)
- 3 Series (92 pages)
- 9010 Series (66 pages)
- 9210 Series (65 pages)
- 9130 Series (174 pages)
- PC Configurator 2 Quick Start (15 pages)
- 9100 RPS (10 pages)
- 9125 Series (235 pages)
- 9120 RPS (11 pages)