Skutt EnviroVent User Manual
Page 3

3
II
INSTALLATION
Preparing for Installation
Unplug your kiln before beginning installation. Place the kiln floor and lid on a clean,
smooth surface.
Before drilling, identify the chamber size of your kiln from the chart below to determine the
correct number and pattern to drill. If you have a blank ring or a wired ring that you do not
use for all of your firing, drill the number of holes for the maximum height of the kiln and
plug the additional holes with a non-combustible material when the extensions are not being
used.
Chamber
Drill this many large holes
and
Drill this many small holes
Depth
(use 15/64” drill)
(use #21 drill)
eight sided kilns
18”
2
20”
2
22 1/2”
3
27”
3
29”
3
31 1/2”
4
ten sided kilns
18”
4
20”
4
22 1/2”
5
27”
5
29”
3
0
31 1/2”
3
0
twelve sided kilns
27’
4
0
31 1/2”
5
0
Placement of holes in kiln floor
Diagram #1
2 holes
3 holes
4 holes
5 holes
3te
r
3”
3”
3”
3”
3”
3”
3”
3”