INSTALLATION

FINAL CHECK

1. Is the Cabinet level?

2. Have all the electrical and piping connections
been made?

3. Has the voltage been tested and checked
against the nameplate rating?

4. Is the unit plugged into a separate electrical
circuit?

5. Is the water supply line shut off valve installed
and is the water turned on?

6. Have the bin interior, and the cabinet exterior
been wiped clean?

7. Are all internal parts in place, including the
spray platform and curtain?

8. Have the internal refrigerant lines been
checked for rubbing and chaffing?

9. Has the machine been installed where it is
indoors, in a controlled environment, with
adequate air circulation around the machine,
and where it can be serviced?