beautypg.com

Scotsman F0522 User Manual

Page 13

background image

Precharged Line Routing - Remote Only

Do not connect the precharged tubing until all
routing and forming of the tubing is complete. See
the Coupling Instructions for final connections.

1. Each set of pre-charged tubing lines contains a
3/8” diameter liquid line, and a 1/2” diameter
discharge line. Both ends of each line have quick
connect couplings.

Note: The openings in the building ceiling or wall,
listed in the next step, are the minimum sizes
recommended for passing the refrigerant lines
through.

2. Have the roofing contractor cut a minimum hole
for the refrigerant lines of 2”. Check local codes, a
separate hole may be required for the electrical
power supply to the condenser.

Caution: Do NOT kink the refrigerant tubing while
routing it.

3. Route the refrigerant tubes thru the roof opening.
Follow straight line routing whenever possible.
Excess tubing may EITHER be coiled up INSIDE
the building OR cut out prior to connection to the
ice maker and condenser.

If the excess tubing is cut out, after re-brazing the
tubing must be evacuated prior to connection to the
ice maker or condenser.

If the excess tubing is to be coiled, spiral it
horizontally to avoid excess trapping in the lines.

5. Have the roofing contractor seal the holes in the
roof per local codes

July 2009

Page 12

N0422, F0522, N0622, F0822, N0922, F1222, N1322, F1522
Air, Water or Remote User Manual

To Remote

Condenser

Fan Motor

Power Supply
to Condenser

Potable Water

Supply

Condensate

Drain

Pre-Charged
Tubing Line
Set

This manual is related to the following products: