Safety precautions, Unpacking and inspection, Site preparation – RGBLink MSP 219 User Manual User Manual
Page 26

MSP 219 User Manual 26
Safety Precautions
For all MSP 219 distributor installation procedures, please observe the
following important safety and handling rules to avoid damage to yourself
and the equipment.
To protect users from electric shock, ensure that the chassis connects
to earth via the ground wire provided in the AC power Cord.
The AC Socket-outlet should be installed near the equipment and be
easily accessible.
Unpacking and Inspection
Before opening MSP 219 distributor shipping box, inspect it for damage. If
you find any damage, notify the shipping carrier immediately for all claims
adjustments. As you open the box, compare its contents against the
packing slip. If you find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and
checked that all the listed components are present, visually inspect the
system to ensure there was no damage during shipping. If there is damage,
notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your MSP 219 should be clean,
properly lit, free from static, and have adequate power, ventilation, and
space for all components.