beautypg.com

Before commissioning, Technical data – REMKO Elektric Booster Heater with Emergency Heating Switch User Manual

Page 11

background image

11

Before commissioning

Before the system is connected to the
mains electricity supply and put into
service for the first time, it is vital that it
is filled with water.

Adjust the thermostat control to the
desired water temperature.
Please note the instructions on page 4.

Check that the STB has been reset.

Switch on emergency heating mode and
check that all heating coils are being
supplied with voltage.


During the heating process, the expan-
sion water generated in the internal boiler
should drip out of the safety valve if there

!

ATTENTION

The warm water drain pipe as well
as parts of the safety equipment
may become hot.

We reserve the right to modify the dimensions and constructional design as part of the ongoing

technical development process.

Technical data

Series

Electric booster heater

Installation location

To be incorporated into the indoor unit

Operating limits

°C

+40 to +85

Power supply

V/Hz

400/3~/50

Max. operating pressure

bar

10

Electr. rated power

consumption

kW

3 / 6 / 9 kW (3 kW per setting)

Number of elements

3

Installation length

mm

400

Total length

580

Thread diameter

mm

2“

Serial number

768W...

EDP no.

260064

is a pressure-tight connection, and out
of the overflow mixer tap if there is an
unpressurised connection (see also P. 5).