Electrical circuit diagram, Before commissioning, 1 2 3 l n – REMKO RXS xxx H User Manual

Page 15

background image

Electrical circuit diagram

After the tightness check has
been successfully completed,
connect the vacuum pump via
the pressure gauge station to
the valve connections on the
outdoor component (see chapter
"Tightness check")
Connect the outdoor component
(see chapter "Tightness check")
and create a vacuum.

Perform the following checks
prior to commissioning the
unit for the first time and after
any interventions affecting the
refrigerant circuit. Record the
results in the commissioning
report:

Check of all refrigerant pipes
and valves with leak detection
spray or soapy water for leaks
and for inadvertent mix up of
suction and injection pipe,
with the unit at a standstill.

Check of all refrigerant pipes
and insulation for damage.

Check of all electrical
connections between indoor
unit and outdoor component
for correct polarity.

Check that all fastenings,
mountings etc. are firm and at
the correct level.

Before
Commissioning

RXS 261H-681H

Colour code
WH = white
BR

= brown

BU

= blue

BK

= black

RXS 1200H

P<

L1

P>

L2L3 N

F

R

V C L N

S T

L

Compressor
contactor

Crankcase heater

Terminal block

Low pr

essur

e switch

High pr

essur

e switch

Phase sequence relay

Mains cable

400V / 1~ /50 Hz

Compressor

FM1

FM2

L1 L2 L3 N

1
2
3
L
N

Liquefier fan

Compressor

Compressor

contactor

Reverse flow valve

Mains cable

230V / 1~ /50 Hz

Liquefier fan 1

Liquefier fan 2

PE