beautypg.com

ONICON System-30 BTU User Manual

Page 10

background image

11451 Belcher Road South, Largo, FL 33773 • USA • Tel +1 (727) 447-6140 • Fax (727) 442-5699 • [email protected]
System-30 BTU Measurement System Manual 05/14 - 0667-2 / 18335

Page 10

3.2 MECHANICAL INSTALLATION

3.2.1 Main Unit Installation

TYPICAL SYSTEM-30 INSTALLATION

!

CAUTION

Before you attempt to use the BTU measurement system, isolate the main unit, open the bypass

and flush the entire system so that it is free of flux, solder, pipe and tube cuttings and any other

free moving particles.

Installing the meter body

1. Make sure the unions are free of nicks or scratches on either end of the flow
meter body and on the process connections.
2. Spray the union faces with a silicone spray or apply a thin coat of beeswax to enhance
seating. Do not use paste thread sealant on union faces.
3. Orient the flow arrow on the meter with the direction of flow.
4. Recommended torques for union seal: 70 ft/lbs minimum
5. Make sure alignment of pipe does not put lateral stress on either joint.

Process

Connection

Process

Connection

Unions