beautypg.com

ONICON System-10 BTU User Manual

Page 12

background image

11451 Belcher Road South, Largo, FL 33773 • USA • Tel +1 (727) 447-6140 • Fax (727) 442-5699 • [email protected]

System-10 BTU Meter Manual 03/15 - 0651-16 / 18323

Page

12

Insertion of the Hot Tap Thermowell

1)

Calculate the insertion force (lbs) required by multiplying the system pressure

(psig) by 0.11. The person inserting the thermowell should ensure adequate

footing for the force required prior to opening the valve.

2)

Thread the hot tap adapter into the valve. Firmly grasp the wiring enclosure,

loosen the position clamping nut, open the valve, and carefully push the

thermowell into the flow stream. Use the attached gage to set the insertion depth.

!

!

CAUTION

Excessive vibration can damage the thermowell. Insert the thermowell to the proper depth using

gauge supplied as shown. Reduce the insertion depth as necessary if strong vibrations are felt

during insertion, making certain that the tip of the thermowell remains fully in the flow stream.

3)

Carefully tighten the position clamping nut that is located at the top of the 1"

NPT hot tap adapter fitting. Do not release the wiring enclosure until the position

clamping nut has been tightened.

CAUTION

DO NOT OVER TIGHTEN THE POSITION CLAMPING NUT. If fluid leaks, do not attempt to

correct by tightening this nut further. An internal o-ring seals the fluid. Contact ONICON for

assistance in the event of a leak.