Nortec SAM-e User Manual
Page 53
SAM-e Installation | 50
FOR DUAL INLETS; INSULATE HEADER AS SHOWN ON PREVIOUS PAGE.
INSULATE SECOND INLET AS SHOWN
ROLL SHIELD TO
CREATE OVERLAP
DETAIL D
USE TIE WRAP 2538347 TO
SECURE IN PLACE.
D
ALWAYS PLACE TIE WRAPS AT THE
ENDS OF THE SHILED, 1/2 INCH IN.
WHEN 3 TIE WRAPS ARE NEEDE
POSITION ONE IN THE
APPROXIMATE MIDDLE CUT OFF
EXCESS END. TIGHTEN UNTIL
SNUG. DO NOT CRUSH
ORIENT END AS SHOWN
Field Retrofit of Installation Dual Inlet Headers
See also other documents in the category Nortec Equipment:
- HumDigital (28 pages)
- NHDI Nortec OnLine (16 pages)
- SynPur (37 pages)
- Steam Distribution (15 pages)
- DRAABE Pure Water System (59 pages)
- AIRFOG Series (48 pages)
- NHDI Resistive Element (40 pages)
- LiveSteam v.1 (38 pages)
- OnLine NHRS (24 pages)
- HP Series (76 pages)
- LINKS 2 SETC (50 pages)
- Outdoor Temperature Sensor (2 pages)
- Off Digital Wall Humidistat (4 pages)
- LINKS 2 SC (44 pages)
- Off Digital Duct Humidistat (4 pages)
- BLOWER PACK For RH Series (6 pages)
- Outdoor Mount Temperature Sensor (2 pages)
- SETC Outdoor (32 pages)
- Off Digital Wall & Duct Humidistat (6 pages)
- 2-10 V Wall & Duct Humidity Sensor (6 pages)
- Steam Distributors (16 pages)
- SE Series (100 pages)
- MES2 (54 pages)
- LINKS XPS SETC (68 pages)
- LINKS 2 GSTC B+ (23 pages)
- Modbus (52 pages)
- RH2+ (62 pages)
- Blower Packs (31 pages)
- LONWORKS (36 pages)
- Remote Interface (34 pages)
- NH-EL Series (99 pages)
- ME Direct Feed (40 pages)
- ME Control (76 pages)
- MLP RO pump station (12 pages)
- ME Control Installation (48 pages)
- Air Humidification System BS (30 pages)
- ME Direct Feed Installation (48 pages)