Operating the powermax – Hypertherm Powermax125 Service Manua User Manual
Page 44

44
Powermax125 Service Manual 808070
3 – Basic System Operations
Operating the Powermax
Follow the steps below to begin cutting or gouging with the system.
This section provides basic operating instructions. Before operating your system in a
production environment, refer to
Hand Torch Setup on page 51 or Machine Torch Setup
Connect the electrical power, gas supply, and torch lead
For information on connecting the proper plug to the power cord, refer to
Power Supply Setup on page 29.
Plug in the power cord and connect the gas supply line. For more information about the electrical requirements and the
gas supply requirements of the Powermax, see
Power Supply Setup on page 29. To connect the torch, push the
FastConnect connector into the receptacle on the front of the power supply. You will attach the work lead in the next step.
CCC units do not ship with a power cord. To maintain CE certification, install power cord
kit 228886.
Torch lead
Work lead
Power cord (does not
ship with plug)
Gas supply line