Test 2 – dc power buss, Test 2 – dc power buss -40, Powermax – Hypertherm Powermax65 Service Manual Rev.1 User Manual
Page 166: Troubleshooting and system tests 5-40, Service manual test 2 – dc power buss
![background image](https://www.manualsdir.com/files/789800/content/doc166.png)
TroubleshooTing and sysTem TesTs
5-40
powermax
65/85
Service Manual
Test 2 – DC Power Buss
Resistance check
Note: All resistance values must be taken with the power cord disconnected and all internal power supply wires
attached.
• Remove the mounting screws from the bulk capacitors and pull the caps away from the power board.
• Measure resistances described in the following tables.
CSA
Test points
Value
TP 10 and 12
25 kΩ
TP 11 and 12
25 kΩ
CE
Test points
Value
TP 11 and 13
18 kΩ
TP 12 and 13
18 kΩ
WORK
LEAD
BLK
BLK
J13
J16
J17
J18
J19
J26
TP12
J28
TP10
TP11
WORK
LEAD
J13
J2
J1
J18
J19
J27
J30
J23
J24
TP13
J29
TP11
TP12
• Replace the bulk capacitor mounting screws before power-up.
This manual is related to the following products: