Maintenance start-up record – Greenheck IGK (472084) User Manual
Page 22

22
Model IGK Make-Up Air
®
Start-Up Checklist
Unit Model Number ____________________________ (e.g. IGK-112-H15-DB)
Unit Serial Number ____________________________ (e.g. 10111000)
Start-up date ____________________________ (MM/DD/YYYY)
Start-up Personnel Name ____________________________
Start-up Company ____________________________
Phone Number ____________________________
Pre Start-Up Checklist - check boxes as items are completed
o Check tightness of all factory wiring connections
o Verify control wiring wire gauge
o Hand-rotate blower to verify free rotation
o Verify supply voltage to the main disconnect
o Verify the supply gas pressure
o Verify remote controls wiring
Start-Up Blower Checklist - refer to Blower Start-Up section for further detail
o Check line voltage
L1-L2 _________________ L2-L3 _______________ L1-L3 _______________
o Check blower rotation
o Check for vibration
o Supply fan RPM
______________
RPM
o Motor nameplate amps
______________
Amps
o Actual motor amps
______________
Amps
o Actual CFM delivered
______________
CFM
Optional Accessories - refer to Blower Start-Up section, step #6 for further detail
o Heating inlet air sensor
______________
Actual Setting (Typical Setting 60-70º F)
Start-Up Indirect Gas - refer to Furnace Start-Up section for further detail
2 Stage furnace control type
o Check supply gas pressure ____________ Maximum
__________ Minimum
__________ Actual
o Set the High Manifold pressure
______________
Inches wg
o Set the Low Manifold pressure
______________
Inches wg
o Set the unit’s operating temperature
______________
degrees F
Maintenance Start-Up Record