Stringing the frame – GAMMA 5003 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 5B - February 2014) User Manual
Page 13

13
STRINGING THE FRAME
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Completing the String Job
Once the fi nal cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fi ed by the racquet manufacturer. Remove the
frame from the mounting system by releasing
the racquet holddowns and loosening the
mounting stands.
This manual is related to the following products:
- 5003 STRINGING MACHINE 6 POINT SC MOUNTING (Issue 10A - Febryary 2014) 5003 STRINGING MACHINE 6 POINT SC MOUNTING (Issue 4A - February 2014) 5003 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 2 - December 2009) 5003 STRINGING MACHINE 6 POINT SC MOUNTING (Issue 1 - April 2010) PROGRESSION STII STRINGING MACHINE (Issue 7A - February 2014) 6004 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 3 - September 2010) 5003 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 3 - August 2010) 6004 STRINGING MACHINE 2 POINT SC MOUNTING (Issue 5C - February 2014) 5003 Els STRINGING MACHINE 6 POINT SC MOUNTING (Issue 7 - December 2009)