Commissioning procedure – Flowserve OR 52-5 User Manual
Page 27
![background image](https://www.manualsdir.com/files/784599/content/doc027.png)
27
Commissioning Procedure
continued
Adjusting time delay for alarm 1
1. Press , the yellow P-LED lights up.
2. Use
to change the LED display until LED Alarm 1
and LED ppm light up. The value saved last is shown.
3. Press , the yellow P-LED and the second digit of the
7-segment display are flashing.
4. Use
to change the digit, press to save the
setting and move to the third digit. The third digit is
now flashing.
5. Use
to change the digit, press to save the
setting. The yellow P-LED and the 7-segment display
are illuminated. A max. time delay of 20 sec. can be adjusted.
6. Press , the equipment returns to normal operation, the actual value is indicated and
the LED ppm is illuminated.
Adjusting time delay for alarm 2
1. Press , the yellow P-LED lights up.
2. Use
to change the LED display until LED Alarm 2
and LED ppm light up. The value saved last is shown.
3. Press , the yellow P-LED and the second digit of the
7-segment display are flashing.
4. Use
to change the digit, press to save the
setting and move to the third digit. The third digit is
now flashing.
5. Use
to change the digit, press to save the
setting. The yellow P-LED and the 7-segment display
are illuminated. A max. time delay of 20 sec. can be adjusted.
6. Press , the equipment returns to normal operation, the actual value is indicated and
the LED ppm is illuminated.
ALARM
1
2
ppm
sec
cal
0
OIL
Test
P
E
P
P
E
E
E
ALARM
1
2
ppm
sec
cal
0
OIL
Test
P
E
P
P
E
E
E