Commissioning procedure – Flowserve OR 52-5 User Manual
Page 23
23
Commissioning Procedure
continued
First Commissioning
1. Switch on measuring transducer
(disconnecting switch).
2. Rinse measuring transducer ORG 12/22 for at
least 15 minutes and operate cleaning device
if necessary.
3. Make sure that the ORG 12/22 is completely free of
air. For visual inspection undo union nuts (inside) and
remove light receiver . When screwing the light
receiver in again make sure that the locating pin
fits exactly in the corresponding groove at the front
collar of the light receiver .
0 % Calibration
Use tap water (with low fluid temperature) or oil-free condensate as turbidity zero.
1. Press until yellow P-LED lights up.
2. Use
to change the LED display until the
calibration LED 0 lights up. The calibration value
(digits) saved last will be indicated.
3. Press , the yellow P-LED and the 7-segment
display are flashing.
4. Press , the 0 % value is saved as basic turbidity.
The P-LED and the 7-segment display are illuminated.
If the basic turbidity is too high an error message
will pop up.
5. Press , the equipment returns to normal operation, 0 ppm is indicated and the LED
for ppm is illuminated.
To cancel press twice, the yellow P-LED will light up again.