beautypg.com

Flowserve Type R User Manual

Page 34

background image

R and RX SLURRY Pump USER INSTRUCTIONS ENGLISH

71569242 03-11 (E)

Page 34 of 56

flowserve.com

®

Refer to section 5.1.1 for methods of oil fill, section
5.2.1 for oil grade recommendations and 5.2.4 for the
schedule and temperature limits.

6.2.4 Mechanical seals
No adjustment is possible. When leakage reaches an
unacceptable level the seal will need replacement.

6.2.5 Gland packing
The stuffing box split gland can be completely
removed for re-packing or to enable the addition of
extra rings of packing.

The stuffing box is normally supplied with a lantern
ring to enable a clean or pressurised flush to the
centre of the packing. If not required, this can be
replaced by an extra 2 rings of packing.

There must always be a small leakage, normally a
minimum of 120 drops per minute to atmosphere to
lubricate and cool the packing is required.
6.3 Spare parts

6.3.1 Ordering of spares
Flowserve keep records of all pumps that have been
supplied. When ordering spares the following
information should be quoted:

1) Pump serial number
2) Pump size and type
3) Part name – taken from section 8
4) Part number – taken from section 8
5) Number of parts required


The pump size and serial number are shown on the
pump nameplate.

To ensure continued satisfactory operation,
replacement parts to the original design specification
should be obtained from Flowserve.
Any change to the original design specification
(modification or use of a non-standard part) will
invalidate the pump’s safety certification.

6.3.2 Storage of spares
Spares should be stored in a clean dry area away
from vibration. Inspection and re-treatment of metallic
surfaces (if necessary) with preservative is
recommended at 6 monthly intervals. Rubber
components must be protected from direct sunlight
and heat as some rubbers are affected by ozone.

6.4 Recommended spares and consumable items

For start up purposes:

1 - complete set of gland packing
2 - shaft sleeves
1 - set of gaskets and seals
(optional: 2 - mechanical seals)


For 2 years operation:

1 - set of bearings (line and thrust)
2 - sets of gland packing
2 - shaft sleeves
2 - sets of gaskets and seals
2 - lantern rings
2 – sets of rubber liners
(optional: 2 - mechanical seals)


For 4 years operation:

1 - set of bearings (line and thrust)
2 - sets of gland packing
2 - shaft sleeves
2 - sets of gaskets and seals
2 - lantern rings
2 – sets of rubber liners
1 - impeller
(optional: 2 - mechanical seals)

6.5 Tools required
A typical range of tools that will be required to
maintain these pumps is listed below.

Readily available in standard tool kits, and dependent
on pump size:

 Open ended spanners (wrenches) to suit up to

M 48 screws/nuts

 Socket spanners (wrenches), up to M 48 screws

 Allen keys, up to 10 mm (A/F)

 Range of screwdrivers

 Soft

mallet

More specialized equipment:

 Bearing

pullers

 Bearing induction heater

 Dial test indicator

 C-spanner (wrench) - for removing shaft nut.

(If difficulties in sourcing are encountered, consult
Flowserve.)

This manual is related to the following products: