DR Power VT1 (1-ton) (Feb 2012 - Present) User Manual
Page 13
CONTACT US AT
www.DRpower.com 13
Attaching the Front Bed Support, Operator Guard, Trailer Jack
&
Pivoting Tow Hitch w/Coupler
Tools Needed:
x
17mm, 18mm, and 24mm Wrenches or an Adjustable Wrench
x
16mm Socket
x
Tape Measure
1. Slide the Front Bed Support onto the Tow Bar with the Mounting Bosses
facing the Left, 9-1/2" from the end of the Main Frame (Figure 16).
2. Install and tighten two M12 x 50mm Bolts and Jam Nuts with an 18mm
Socket for the Bolts and an 18mm Wrench for the Nuts (Figure 17).
3. Slide the Operator Guard onto the Tow Bar with the Mounting Bosses
facing to the Left, 26" from the end of the Main Frame (Figure 16).
4. Install two M16 x 50mm Bolts with M16 Jam Nuts (Figure 18) into the
Operator Guard Bosses on the Right Side and tighten the Bolts with a
24mm Socket and the Jam Nuts with a 24mm Wrench or Adjustable
Wrench.
5. Slide the Trailer Jack 10-1/2" onto the Tow Bar (Figure 16), with the
Mounting Boss facing the Left side of the Trailer. Tighten the M16 x 50mm
Trailer Jack Bolt and M16 Jam Nut with a 24mm Socket and Wrench.
NOTE: You may need to loosen the Bolt installed in the Trailer Jack prior to
installation to be able to slide the Jack onto the Tow Bar.
9-1/2"
10-1/2"
26"
Figure 16
Mounting
Bosses
Mounting
Bosses
M16 x 50mm Bolt
w/Jam Nut
Figure 18
Figure 17
M12 x 50mm Bolt(s)
w/Jam Nut(s)