Specifications, Electrical, Fault relay contacts – Contemporary Control Systems AI-FR Redundant Fibre Hubs User Manual
Page 2: Environmental, Data rate, Timing, Optical power budget, Dimensions, Compatibility, Shipping weight

TD675300-0ID
2
SPECIFICATIONS
Electrical
DC
AC
Input voltage:
10–36 V
8–24 V
Input power:
4 W
4 VA
Input frequency:
N/A
47–63 Hz
Fault Relay Contacts
Max current and voltage:
500 mA
200 V
Environmental
Operating temperature:
0°C to +60°C
Storage temperature:
–40°C to +85°C
Data Rate
AI-FR hubs operate at 2.5 Mbps.
Timing
AI-FR delay time:
330 ns maximum at 2.5 Mbps
Unlatch delay time:
11.9
µ
s at 2.5 Mbps
Optical Power Budget (-FOG 850 nm at 25°C)
50/125 microns
6.6 dB
62.5/125 microns
10.4 dB
100/140 microns
15.9 dB
Dimensions
Compatibility
5.45" x 6.14" (139 mm x 156 mm)
Compliant with ANSI/ATA 878.1
Shipping Weight
Regulatory Compliance
2lbs. (.9kg)
CE Mark
CFR 47, Part 15 Class A
Mechanical
See also other documents in the category Contemporary Control Systems Hardware:
- AI Active Hubs (40 pages)
- AI-SRVR Servers to Ethernet Installation Guide (12 pages)
- AI-USB Adapters (12 pages)
- AI-SRVR Servers to Ethernet User Manual (20 pages)
- PCX20 Adapters (16 pages)
- MODHUB Active Hubs (32 pages)
- PCI20EX Adapters (12 pages)
- QuickLink Active Hubs (8 pages)
- USB222 Adapters (8 pages)
- BAScontrol20 Installation Guide (16 pages)
- BASgatewayLX (16 pages)
- BASremote Installation Guide (20 pages)
- BAScontrol20 User Manual (53 pages)
- BASremote Application Guide (13 pages)
- BASremote User Manual (firmware 2.x) (78 pages)
- BASrouter Installation Guide (Firmware 2.7.x) (24 pages)
- BASrouter Portable Installation Guide (Firmware 2.7.x) (20 pages)
- BASrouterLX Successful BASrouter Installation and Operation (3 pages)
- BASrouterLX Installation Guide (12 pages)
- BASrouterLX Application Guide (20 pages)
- CAN104 (8 pages)
- CANPCI (8 pages)
- BASview (81 pages)
- Compact Unmanaged Switches (4 pages)
- EIBA BAS Unmanaged Switches (4 pages)
- EIDX Managed Automation Switches Installation Guide for PoE Models (8 pages)
- EIPR Wired/Wireless VPN Router Installation Guide (4 pages)
- EIDX Managed Automation Switches Software Manual for Console Access (80 pages)
- EISK Managed Skorpion Switches Software Manual (83 pages)
- EIS UL864-Compliant Switches (8 pages)
- EISC Configurable Switches Installation Guide (8 pages)
- EISK Skorpion Switches EISK8-GT (4 pages)
- EISK Managed Skorpion Switches Installation Guide (4 pages)
- EIPR Wired/Wireless VPN Router Application Guide (14 pages)
- EISC Configurable Switches User Manual (36 pages)
- EISK Skorpion Switches EISK5-100T/FCS (4 pages)
- BACnet Cube I/O BMT-DI4 (3 pages)
- BACnet Cube I/O BMT-DI10 (3 pages)
- BACnet Cube I/O BMT-AI8 (4 pages)
- BACnet Cube I/O BMT-SI4 (3 pages)
- BACnet Cube I/O BMT-DO4 (3 pages)
- BACnet Cube I/O BMT-AO4 (3 pages)
- Sedona (27 pages)
- BACnet Cube I/O BMT-DIO4/2 (4 pages)